ARTVIN DERINER DAM AND HEPP POWER PLANT

All Mechanical and Electrical Installation Works

WORKS COMPLETED WITHIN THE SCOPE OF THE PROJECT


  • SANITARY AND JOINT SYSTEM INSTALLATIONS
  • Installation of all WC, kitchen sanitary ware, armature, hydrophore, water tank, water softener, biological waste water package treatment and installation materials. Installation of clean water galvanizing, waste water PVC piping, valve, strainer, check valve materials.


  • FIRE EXTINGUISHING SYSTEM INSTALLATION
  • Installation of fire water booster, fire cabinet, fire tubes and Q300 galvanized pipe fire installation.


  • HEATING, VENTILATION AND COOLING SYSTEM INSTALLATIONS
  • Air handling unit, aspirator, ventilator, electric heater, air-cooled water chiller, humidifier, installation of devices, polyurethane duct, grille, damper, shutter, cooling piping system and valve, strainer, check valve, cooling pump and automation system.